Electrical Cabinet Cleaning with Dry Ice Blasting – Birmingham Case Study
The Problem Optimum Dry Ice Blasting was called to an electrical substation in Birmingham following a fire associated with contamination inside the electrical cabinets. Years of accumulated grime and contamination had built up around sensitive …

